Optimising pump scheduling across a water transmission network
A hydraulic model and a mixed-integer optimiser schedule pumps against tariff periods and reservoir constraints, cutting energy cost while keeping storage within agreed limits.
- -16%pumping energy cost
- -38%pump starts per day
- 0reservoir limit breaches in 9 months